***Hover mouse over project icons to see details of Sub-projects***

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Tree Type of Project : Agroforestry
Name of People's Org'n : Macalino Indigenous Farmers Association
Location : Macalino, Calanasan, APAYAO
Name of PO/IPO Pres. : -
Total Area : 15 Has.
Total Cost : 480,000.00
Date Started : May 22,2014
Date Completion(Revised): April 2016
Agro Plots : 44
Area Planted(Ha.) : 15 Has.
Area Planted(%) : 100%
Species Planted : Rambutan
Total Amt. Released : 422,575.65
Balance Amount : 57,424.35
REMARKS : Maintenance on-going
Tree (1)Type of Project : Reforestation
Location : Buluan, Conner, APAYAO
Name of People's Org'n : Buluan Indigenous Group Association (BIGA)
Name of PO/IPO Pres. : Conrado V. Serquina
Project Cost : 533,600.00
Total Area : 23 Has.
Date Started : March 2013/March 2014(Expansion)
Date Completion(Revised): December 2015/June 2016(Expansion)
No. of refo sites : 2
Area Planted/% Planted : 23 Has./100%
Total Amount Released : 272,064.40
Balance Amount : 261,535.60
REMARKS : Last pass maintenance not yet conducted/2 passes maintenance to be conducted(Expansion)

(2)Type of Project : Agroforestry
; Name of People's Org'n : Buluan Indigenous Group Association
Location : Buluan, Conner, APAYAO
Name of PO/IPO Pres. : Conrado V. Serquina
Total Area : 16 Has.
Total Cost : 512,000.00
Date Started : February 2013
Date Completion(Revised): January 2016
Agro Plots(No.) : 29
Area Planted(Ha.) : 16 Has.
Area Planted(%) : 100%
Species Planted : Rambutan
Total Amt. Released : 404,100.00
Balance Amount : 107,900.00
REMARKS : Activities completed
Tree (1)Type of Project : Reforestation
Location : Cadaclan, Calanasan, APAYAO
Name of People's Org'n : Isnag Farmers Association
Name of PO/IPO Pres. : Lapprades Tubban
Project Cost : 765,600.00
Total Area : 33(Expansion)Has.
Date Started : May 22, 2014
Date Completion(Revised): June 2016
No. of refo sites : 3
Area Planted/% Planted : 33 Has./100%
Total Amount Released : 171,994.57
Balance Amount : 593,605.43
REMARKS : 2 passes maintenance to be conducted

(2)Type of Project : Agroforestry(2 Batches)
Name of People's Org'n : Isnag Farmers Association
Location : Cadaclan, Calanasan, APAYAO
Name of PO/IPO Pres. : Lapprades Tubban
Total Area : 19.43 Has.
Total Cost : 621,760.00
Date Started : May 22, 2014
Date Completion(Revised): April 2016
Agro Plots : 47
Area Planted(Ha.) : 19.43 Has.
Area Planted(%) : 100%
Species Planted : Rambutan
Total Amt. Released : 545,767.71
Balance Amount : 75,992.29
REMARKS : Maintenance on-going
Tree (1)Type of Project : Reforestation
Location : Tanglagan, Calanasan, APAYAO
Name of People's Org'n : Tanglagan Integrated Cultural Community Association (TICCA)
Name of PO/IPO Pres. : Jonash A. Laylay
Project Cost : 2,760,800.00
Total Area : 91(55 Refo/36 Expansion)Has.
Date Started : June 2012/March 2014(Expansion)
Date Completion(Revised): December 2015/June 2016(Expansion)
No. of refo sites : 3
Area Planted/% Planted : 100 Has./84%
Total Amount Released : 1,782,679.50
Balance Amount : 978,120.50
REMARKS : Last pass maintenance not yet conducted/2 passes maintenance to be conducted(Expansion)

(2)Type of Project : Agroforestry
Name of People's Org'n : Tanglagan Integrated Cultural Community Association (TICCA)
Location : Tanglagan(Bay Sur & Kilkiling), Calanasan, APAYAO
Name of PO/IPO Pres. : Jonash A. Laylay
Total Area : 26.27(13.54 Bay Sur/12.73 Kilkiling)Has.
Total Cost : 840,640.00
Date Started : May 28,2014
Date Completion(Revised): April 2016
Agro Plots : 54
Area Planted(Ha.) : 26.27 Has.
Area Planted(%) : 100%
Species Planted : Lanzones & Rambutan
Total Amt. Released : 724,014.59
Balance Amount : 116,625.41
REMARKS : Maintenace on-going
Tree (1)Type of Project : Reforestation
Location : Naguilian, Calanasan, APAYAO
Name of People's Org'n : Naguilian Indigenous Farmers Association (NIFA)
Name of PO/IPO Pres. : Nestor Aliten
Project Cost : 1,252,800.00
Total Area : 54(45 Refo/9 Expansion)Has.
Date Started : March 12, 2013/March 2014(Expansion)
Date Completion(Revised): December 2015/June 2016(Expansion)
No. of refo sites : 3
Area Planted/% Planted : 54 Has./100%
Total Amount Released : 737,687.25
Balance Amount : 515,112.75
Physical Status : Last pass maintenance not yet conducted/2 passes maintenance to be conducted(Expansion)

(2)Type of Project : Agroforestry(2 Batches)
Name of People's Org'n : Naguilian Indigenous Farmers Association (NIFA)
Location : Naguilian, Calanasan, APAYAO
Name of PO/IPO Pres. : Nestor Aliten
Total Area : 22.40 Has.
Total Cost : 716,800.00
Date Started : February 16,2015
Date Completion(Revised): April 2016
Agro Plots : 34
Area Planted(Ha.) : 22.40 Has.
Area Planted(%) : 100%
Species Planted : Lanzones & Rambutan
Total Amt. Released : 645,120.00
Balance Amount : 71,680.00
REMARKS : Maintenance on-going
Tree (1)Type of Project : Reforestation
Location : Eva Puzon, Calanasan, APAYAO
Name of People's Org'n : Eva Garden Farmers Organization (EGFO)
Name of PO/IPO Pres. : Rafael L. Aleta
Project Cost : 2,111,200.00
Total Area : 91(55 Refo/36 Expansion)Has.
Date Started : March 12, 2013/February 2014(Expansion)
Date Completion(Revised): December 2015/June 2016(Expansion)
No. of refo sites : 5
Area Planted/% Planted : 65 Has./71%
Total Amount Released : 1,476,790.88
Balance Amount : 277,028.12
REMARKS : Last pass maintenance not yet conducted/2 passes maintenance to be conducted(Expansion)

(2)Type of Project : Agroforestry(2 Batches)
Name of People's Org'n : Eva Garden Farmers Organization (EGFO)
Location : Eva Puzon, Calanasan, APAYAO
Name of PO/IPO Pres. : Rafael L. Aleta
Total Area : 22.62 Has.
Total Cost : 723,840.00
Date Started : October 16,2014
Date Completion(Revised): April 2016
Agro Plots : 38
Area Planted(Ha.) : 22.62 Has.
Area Planted(%) : 100%
Species Planted : Rambutan
Total Amt. Released : 644,313.20
Balance Amount : 79,526.80
REMARKS : Maintenance on-going
Road Icon Proponent :PLGU
Province :APAYAO
Municipality:KABUGAO
Barangay :BADDUAT
Name of Sub-Project:Rehabilitation of BADDUAT-CULILIMTAW-TABBA FMR
Sub-Project Type:FARM TO MARKET ROAD
Implementation Status:COMPLETED
CFA/Non-CFA:NON-CFA
Quantity: 7.00
Unit:KMS.
Total Project Cost: 8,750,000.00
Fund Source:IFAD
% Physical Accomplishment: 100%
REMARKS: PHYSICALLY COMPLETED
Foot Bridge Proponent :MLGU
Province :APAYAO
Municipality:CONNER
Barangay :ILI
Name of Sub-Project:Construction of SUSPENDED (Cable) FB at ILI
Sub-Project Type:FOOTBRIDGE
Implementation Status:COMPLETED
CFA/Non-CFA:NON CFA
Quantity:100
Unit:LMS.
Total Project Cost:4,290,414.81
Fund Source:OFID
% Physical Accomplishment:100%
REMARKS:PHYSICALLY COMPLETED, 100% PROJECT COUNTERPART RELEASED
Road Icon Proponent :MLGU
Province :APAYAO
Municipality:CONNER
Barangay :KARIKITAN
Name of Sub-Project:Rehabilitation of KARIKITAN - DINAKPAN FMR
Sub-Project Type:FARM TO MARKET ROAD
Implementation Status: COMPLETED
CFA/Non-CFA:CFA (75M)
Quantity:4
Unit:KMS.
Total Project Cost:10,000,000.00
Fund Source:IFAD
% Physical Accomplishment: 100%
REMARKS: PHYSICALLY COMPLETED
Road Icon Proponent :MLGU
Province :APAYAO
Municipality:KABUGAO
Barangay :CABETAYAN
Name of Sub-Project:Improvement of CABETAYAN-LANNAG-KARAGAWAN FMR
Sub-Project Type:FARM TO MARKET ROAD
Implementation Status: COMPLETED
CFA/Non-CFA:CFA (75M)
Quantity:4.00
Unit:KMS.
Total Project Cost:9,850,000.00
Fund Source:IFAD
% Physical Accomplishment: 100%
REMARKS: PHYSICALLY COMPLETED
Road Icon Proponent :PLGU
Province :APAYAO
Municipality:CONNER
Barangay :TALIFUGO
Name of Sub-Project:Rehabilitation of PAGUYUDAN-TALIFUGO FMR
Sub-Project Type:FARM TO MARKET ROAD
Implementation Status:COMPLETED
CFA/Non-CFA:CFA (75M)
Quantity:1.9
Unit:KMS.
Total Project Cost:5,000,000.00
Fund Source:OFID
% Physical Accomplishment:100%
REMARKS: PHYSICALLY COMPLETED, 100% PROJECT COUNTERPART RELEASED
Road Icon Proponent : PLGU
Province : APAYAO
Municipality: CALANASAN
Barangay : CADACLAN
Name of Sub-Project: Rehab. of EVA-PUZON CADACLAN FMR,PH.1
Sub-Project Type: FARM TO MARKET ROAD
Implementation Status: COMPLETED
CFA/Non-CFA: NON CFA
Quantity: 8.00
Unit: KMS.
Total Project Cost: 20,000,000.00
Fund Source: IFAD
% Physical Accomplishment: 100%
REMARKS: PHYSICALLY COMPLETED, 100% PROJECT COUNTERPART RELEASED
Road Icon Proponent :MLGU
Province :APAYAO
Municipality:KABUGAO
Barangay :LENNENG
Name of Sub-Project:Rehabilitation of BANAN-LENNENG FMR
Sub-Project Type:FARM TO MARKET ROAD
Implementation Status: COMPLETED
CFA/Non-CFA:NON CFA
Quantity:0.60
Unit:KMS.
Total Project Cost:1,610,811.15
Fund Source:IFAD
% Physical Accomplishment: 100%
REMARKS: PHYSICALLY COMPLETED, 100% PROJECT COUNTERPART RELEASED
FMR Proponent :MLGU
Province :APAYAO
Municipality:KABUGAO
Barangay :LENNENG
Name of Sub-Project:Rehabilitation of KALYAT - GUBOBAN FMR
Sub-Project Type:FARM TO MARKET ROAD
Implementation Status:COMPLETED
CFA/Non-CFA:NON CFA
Quantity:2.5
Unit:KMS.
Total Project Cost:6,011,508.05
Fund Source:OFID
% Physical Accomplishment:100%
REMARKS:PHYSICALLY COMPLETED, 100% PROJECT COUNTERPART RELEASED
FMR Proponent :MLGU
Province :APAYAO
Municipality:KABUGAO
Barangay :LUTTUACAN
Name of Sub-Project:Rehabilitation of ANGANOPAN-PACO VALLEY FMR
Sub-Project Type:FARM TO MARKET ROAD
Implementation Status:COMPLETED
CFA/Non-CFA:CFA (75M)
Quantity:2.8
Unit:KMS.
Total Project Cost:7,486,836.24
Fund Source:IFAD
% Physical Accomplishment: 100%
REMARKS:PHYSICALLY COMPLETED
Tree (1)Type of Project : Reforestation
Location : Karikitan, Conner, APAYAO
Name of People's Org'n : Karikitan Indigenous Association(KaRiNA)
Name of PO/IPO Pres. : Erlinda Gasatan
Project Cost : 2,505,600.00
Total Area : 108 Has.
Date Started : March 1,2012/March 2014(Expansion)
Date Completion(Revised): December 2015/June 2016(Expansion)
No. of refo sites : 1
Area Planted/% Planted : 108 Has./100%
Total Amount Released : 1,289,385.01
Balance Amount : 1,216,214.99
REMARKS : Last passes maintenance not yet conducted/2 passes maintenance to be conducted(Expansion)

(2)Type of Project : Agroforestry
Name of People's Org'n : Karikitan Indigenous Association
Location : Karikitan, Conner, APAYAO
Name of PO/IPO Pres. : Erlinda Gasatan
Total Area : 16.77 Has.
Total Cost : 536,640.00
Date Started : -
Date Completion(Revised): April 2016
Agro Plots(No.) : 19
Area Planted(Ha.) : 16.77 Has.
Area Planted(%) : 100%
Species Planted : Lanzones & Rambutan
Total Amt. Released : 444,258.46
Balance Amount : 92,381.54
REMARKS : Activities completed
Tree (1)Type of Project : Reforestation
Location : Paddaoan, Conner, APAYAO
Name of People's Org'n : Paddaoan Indigenous Movement Association
Name of PO/IPO Pres. : Fernando Seoad
Project Cost : 3,178,400.00
Total Area : 137 Has.
Date Started : March 2012/March 2014(Expansion)
Date Completion(Revised): December 2015/June 2016(Expansion)
No. of refo sites : 3
Area Planted/% Planted : 137 Has./100%
Total Amount Released : 1,868,667.90
Balance Amount : 1,309,732.10
REMARKS : Last pass maintenance not yet conducted/2 passes maintenance to be conducted(Expansion)

(2)Type of Project : Agroforestry
Name of People's Org'n : Paddaoan Indigenous Movement Association
Location : Paddaoan, Conner, APAYAO
Name of PO/IPO Pres. : Fernando Seoad
Total Area : 20.79 Has.
Total Cost : 665,280.00.00
Date Started : -
Date Completion(Revised): June 2016
Agro Plots(No.) : 71
Area Planted(Ha.) : 20.79 Has.
Area Planted(%) : 100%
Species Planted : Lanzones & Rambutan
Total Amt. Released : 592,914.60
Balance Amount : 72,365.40
REMARKS : Maintenance on-going
Tree (1)Type of Project : Reforestation
Location : Talifugo, Conner, APAYAO
Name of People's Org'n : Talifugo Farmers Association (TFA)
Name of PO/IPO Pres. : Moises Agliwan
Project Cost : 1,879,200.00
Total Area : 81 Has.
Date Started : March 2012/March 2014(Expansion)
Date Completion(Revised): September 2015/June 2016(Expansion)
No. of refo sites : 1
Area Planted/% Planted : 81 Has./100%
Total Amount Released : 1,390,405.50
Balance Amount : 488,794.50
REMARKS : Activities completed/2 passes maintenance to be conducted(Expansion)

(2)Type of Project : Agroforestry
Name of People's Org'n : Talifugo Indigenous Farmers Association
Location : Talifugo, Conner, APAYAO
Name of PO/IPO Pres. : Moises Agliwan
Total Area : 14 Has.
Total Cost : 448,000.00
Date Started : February 20,2013
Date Completion(Revised): January 2016
Agro Plots : 23
Area Planted(Ha.) : 14 Has.
Area Planted(%) : 100%
Species Planted : Lanzones & Rambutan
Total Amt. Released : 387,829.83
Balance Amount : 60,170.17
REMARKS : Maintenance on-going
Tree (1)Type of Project : Reforestation
Location : Badduat, Kabugao, APAYAO
Name of People's Org'n : Badduat Farmers Association (BFA)
Name of PO/IPO Pres. : Precila Blas
Project Cost : 1,902,400.00
Total Area : 82 Has.
Date Started : March 2012/March 6,2014(Expansion)
Date Completion(Revised): December 2015/June 2016(Expansion)
No. of refo sites : 6
Area Planted/% Planted : 82 Has./100%
Total Amount Released : 1,523,376.26
Balance Amount : 379,023.74
REMARKS : Last pass maintenance not yet conducted/2 passes maintenance to be conducted(Expansion)

(2)Type of Project : Agroforestry
Name of People's Org'n : Badduat Farmers Association (BFA)
Location : Badduat, Kabugao, APAYAO
Name of PO/IPO Pres. : Precila Blas
Total Area : 12.8 Has.
Total Cost : 409,600.00
Date Started : -
Date Completion(Revised): April 2016
Agro Plots : 32
Area Planted(Ha.) : 12.8 Has.
Area Planted(%) : 100%
Species Planted : Rambutan
Total Amt. Released : 363,318.05
Balance Amount : 46,281.95
REMARKS : Maintenance on-going
Tree (1)Type of Project : Reforestation
Location : Luttuacan, Kabugao, APAYAO
Name of People's Org'n : Tribal Association of Luttuacan Indigenous Peoples (TALIP)
Name of PO/IPO Pres. : Norma Hidalgo
Project Cost : 2,018,400.00
Total Area : 87 Has.
Date Started : March 2012/March 2014(Expansion)
Date Completion(Revised): December 2015/June 2016(Expansion)
No. of refo sites : 6
Area Planted/% Planted : 87 Has./100%
Total Amount Released : 1,230,925.95
Balance Amount : 787,474.05
REMARKS : Last pass maintenance not yet conducted/2 passes maintenance to be conuducted(Expansion)

(2)Type of Project : Agroforestry
Name of People's Org'n : Tribal Association of Luttuacan Indigenous Peoples (TALIP)
Location : Luttuacan, Kabugao, APAYAO
Date Started : June 2012
Date Completion(Revised): December 2015
Name of PO/IPO Pres. : Norma Hidalgo
Total Area : 11.6 Has.
Total Cost : 371,200.00
Date Started : September 2014
Date Completion(Revised): April 2016
Agro Plots : 28
Area Planted(Ha.) : 11.6 Has.
Area Planted(%) : 100%
Species Planted : Rambutan
Total Amt. Released : 334,080.00
Balance Amount : 37,120.00
REMARKS : Maintenance on-going
Tree (1)Type of Project : Reforestation
Location : Lenneng, Kabugao, APAYAO
Name of People's Org'n : Lenneng Tribal Timpuyog Association (LTTA)
Name of PO/IPO Pres. : Jhon Baduyot
Project Cost : 2,784,000.00
Total Area : 120 Has.
Date Started : January 18,2012/March 2014(Expansion)
Date Completion(Revised): December 2015/June 2016(Expansion)
No. of refo sites : 7
Area Planted/% Planted : 120 Has./100%
Total Amount Released : 1,546,155.00
Balance Amount : 1,237,845.00
REMARKS : Last pass maintenance not yet conducted/2 passes maintenance to be conducted(Expansion)

(2)Type of Project : Agroforestry(2 Batches)
Name of People's Org'n : Lenneng Tribal Timpuyog Association (LTTA)
Location : Lenneng, Kabugao, APAYAO
Name of PO/IPO Pres. : Jhon Baduyot
Total Area : 31 Has.
Total Cost : 992,000.00
Date Started : September 2014
Date Completion(Revised): April 2016
Agro Plots(No.) : 84
Area Planted(Ha.) : 31 Has.
Area Planted(%) : 100%
Species Planted : Rambutan
Total Amt. Released : -
Balance Amount : 749,699.71
Physical Status : Maintenance on-going
Tree (1)Type of Project : Reforestation
Location : Karagawan, Kabugao, APAYAO
Name of People's Org'n : Karagawan Indigenous Association (KIA)
Name of PO/IPO Pres. : Rogelio Taguban
Project Cost : 1,600,800.00
Total Area : 69 Has.
Date Started : June 2012/March 2014(Expansion)
Date Completion(Revised): December 2015/June 2016(Expansion)
No. of refo sites : 2
Area Planted/% Planted : 69 Has./100%
Total Amount Released : 954,011.25
Balance Amount : 646,788.75
REMARKS : Last pass maintenance not yet conducted/2 passes maintenance to be conducted(Expansion)

(2)Type of Project : Agroforestry
Name of People's Org'n : Name of People's Org'n : Karagawan Indigenous Association (KIA)
Location : Karagawan, Kabugao, APAYAO
Name of PO/IPO Pres. : Rogelio Taguban
Total Area : 13.2 Has.
Total Cost : 422,400.00
Date Started : September 2014
Date Completion(Revised): April 2016
Agro Plots(No.) : 33
Area Planted(Ha.) : 13.2 Has.
Area Planted(%) : 100%
Species Planted : Rambutan
Total Amt. Released : 358,265.97
Balance Amount : 64,134.03
REMARKS : Maintenance on-going
Tree (1)Type of Project : Reforestation
Location : Cabetayan, Kabugao, APAYAO
Name of People's Org'n : Cabetayan Farmers Union Association (CFUA)
Name of PO/IPO Pres. : Miguel Tallongan
Project Cost : 1,160,000.00
Total Area : 50 Has.
No. of refo sites : 4
Date Started : February 20,2013
Date Completion(Revised): December 2015
Area Planted/% Planted : 50 Has./100%
Total Amount Released : 1,044,000.00
Balance Amount : 116,000.00
REMARKS : Last pass maintenance not yet conducted

(2)Type of Project : Agroforestry
Name of People's Org'n : Cabetayan Farmers Union Association (CFUA)
Location : Cabetayan, Kabugao, APAYAO
Name of PO/IPO Pres. : Miguel Tallongan
Total Area : 13.20 Has.
Total Cost : 422,400.00
Date Started : September 2014
Date Completion(Revised): April 2016
Agro Plots(No.) : 33
Area Planted(Ha.) : 13.20 Has.
Area Planted(%) : 100%
Species Planted : Rambutan
Total Amt. Released : 375,579.76
Balance Amount : 46,820.24
REMARKS : Maintenance on-going
Tree (1)Type of Project : Reforestation
Location : Ili, Conner, APAYAO
Name of People's Org'n : Liwanian Indigenous Community Association, Incorporated (LICA,Inc.)
Name of PO/IPO Pres. : Andrew Atiwag
Project Cost : 1,992,169.00
Total Area : 86 Has.
Date Started : September 2011/February 2014(Expansion)
Date Completion(Revised): December 2015/June 2016(Expansion)
No. of refo sites : 2
Area Planted/% Planted : 86 Has./100%
Total Amount Released : 1,348,316.21
Balance Amount : 643,852.79
REMARKS : Last pass maintenance not yet conducted/2 passes maintenance to be conducted(Expansion)

(2)Type of Project : Agroforestry
Name of People's Org'n : Liwanian Indigenous Community Association, Incorporated (LICA,Inc.)
Location : Ili, Conner, APAYAO
Name of PO/IPO Pres. : Andrew Atiwag
Total Area : 14 Has.
Total Cost : 448,000.00
Date Started : February 20,2013
Date Completion(Revised): January 2016
Agro Plots(No.) : 27
Area Planted(Ha.) : 14 Has.
Area Planted(%) : 100%
Species Planted : Lanzones & Rambutan
Total Amt. Released : 374,224.86
Balance Amount : 73,775.14
REMARKS : Maintenace on going

 

 

 

 

LEGEND
FMR Farm-to-Market Road(FMR)
Foot Bridge Foot Bridge
Domestic Water Supply Domestic Water Supply(DWS)
Communal Irrigation System Communal Irrigation System(CIS)
Foot Path Foot Path/Trail
Home Community Infrastructure-MP Warehouse/MPDP
Refo/ANR Reforestation/ANR & Agroforestry
Physically Completed Sub-Projects Physically Completed Sub-Projects
Cancelled Sub-Projects Cancelled Sub-Projects

 

 

 

 

 

Summary: OVERALL PHYSICAL STATUS of Infra sub-projects(APAYAO)

Total no. of Sub-Projects(SPs): 9

Physically Completed SPs: 9(100% Overall)

Status of On-going Sub-Projects: All Sub-Projects physically completed

 

Apayao Map

COMPONENT UPDATES:pdf iconDetailed/Tabular Format

  • Equipment
  • ESF Training
  • FBS
  • Financial Literacy
  • LAF
  • Learning Visits
  • O and M Training
  • Production Training
  • Skills Training
  • Starter Kits(Meat/Food)
  • Supplies/Materials
  • Techno Demo