KALINGA Project Sites

updated December 29, 2016

***Hover mouse over project icons to see details of Sub-projects***

 

 

 

 

 

FMR Proponent :PLGU
Province :KALINGA
Municipality:PASIL
Barangay :COLAYO
Name of Sub-Project:Improvement of COLAYO-BATONG-BUHAY FMR
Sub-Project Type:FARM TO MARKET ROAD
Implementation Status: ON-GOING
CFA/Non-CFA:NON CFA
Quantity:5.00
Unit:KMS.
Total Project Cost:8,700,000.00
Fund Source:IFAD
% Physical Accomplishment: 80%
REMARKS: ON-GOING IMPLEMENTATION
Home Proponent :MLGU
Province :KALINGA
Municipality:BALBALAN
Barangay :POSWOY
Name of Sub-Project:Construction of POSWOY Multi Purpose Warehouse
Sub-Project Type:COMMUNITY INFRASTRUCTURE
Implementation Status: COMPLETED
CFA/Non-CFA:NON CFA
Quantity:1
Unit:UNIT
Total Project Cost: 1,000,000.00
Fund Source:IFAD
% Physical Accomplishment: 100%
REMARKS: PHYSICALLY COMPLETED
Home Proponent :MLGU
Province :KALINGA
Municipality:BALBALAN
Barangay :AB-ABA-AN
Name of Sub-Project:Construction of AB-ABA-AN Multi Purpose Warehouse
Sub-Project Type:COMMUNITY INFRASTRUCTURE
Implementation Status: COMPLETED
CFA/Non-CFA:NON CFA
Quantity:1
Unit:UNIT
Total Project Cost: 1,000,000.00
Fund Source:IFAD
% Physical Accomplishment: 100%
REMARKS: PHYSICALLY COMPLETED
Home Proponent :MLGU
Province :KALINGA
Municipality:BALBALAN
Barangay :TAWANG
Name of Sub-Project:Construction of BARANGAY TAWANG Multi-Purpose Warehouse
Sub-Project Type:COMMUNITY INFRASTRUCTURE
Implementation Status: COMPLETED
CFA/Non-CFA:NON CFA
Quantity:1
Unit:UNIT
Total Project Cost: 1,000,000.00
Fund Source:IFAD
% Physical Accomplishment: 100%
REMARKS: PHYSICALLY COMPLETED
Home Proponent :MLGU
Province :KALINGA
Municipality:BALBALAN
Barangay :BUAYA
Name of Sub-Project:Construction of BAGWANG Multi Purpose Pavement
Sub-Project Type:COMMUNITY INFRASTRUCTURE
Implementation Status: COMPLETED
CFA/Non-CFA:NON CFA
Quantity:1
Unit:UNIT
Total Project Cost:523,886.38
Fund Source:IFAD
% Physical Accomplishment: 100%
REMARKS: SUBJECT FOR FINAL INSPECTION
CIS Proponent :MLGU
Province :KALINGA
Municipality:BALBALAN
Barangay :AB-ABA-AN
Name of Sub-Project:Rehabilitation of POKOK CIS
Sub-Project Type:COMMUNAL IRRIGATION SYSTEM
Implementation Status: COMPLETED
CFA/Non-CFA:NON CFA
Quantity:10.0
Unit:HAS.
Total Project Cost:689,823,00.
Fund Source:IFAD
% Physical Accomplishment: 100%
REMARKS: SUBJECT FOR FINAL INSPECTION
CIS Proponent :MLGU
Province :KALINGA
Municipality:BALBALAN
Barangay :POSWOY
Name of Sub-Project:Rehabilitation of KESENG TO PILALAW CIS
Sub-Project Type:COMMUNAL IRRIGATION SYSTEM
Implementation Status: COMPLETED
CFA/Non-CFA:NON CFA
Quantity:12.0
Unit:HAS.
Total Project Cost:1,470,985.37
Fund Source:IFAD
% Physical Accomplishment: 100%
REMARKS: PHYSICALLY COMPLETED
CIS Proponent :MLGU
Province :KALINGA
Municipality:BALBALAN
Barangay :TAWANG
Name of Sub-Project:Rehabilitation of BOKANG CIS
Sub-Project Type:COMMUNAL IRRIGATION SYSTEM
Implementation Status: COMPLETED
CFA/Non-CFA:NON CFA
Quantity:10.0
Unit:HAS.
Total Project Cost:1,240,694.16
Fund Source:OFID
% Physical Accomplishment: 100%
REMARKS: PHYSICALLY COMPLETED
CIS (1)Proponent:MLGU
Province :KALINGA
Municipality:BALBALAN
Barangay :POSWOY
Name of Sub-Project:Rehabilitation of SEKLANG PULAY CIS
Sub-Project Type:COMMUNAL IRRIGATION SYSTEM
Implementation Status: COMPLETED
CFA/Non-CFA:NON CFA
Quantity:25.0
Unit:HAS.
Total Project Cost:3,122,718.57
Fund Source:OFID
% Physical Accomplishment: 100%
REMARKS:PHYSICALLY COMPLETED

(2)Proponent:MLGU
Province :KALINGA
Municipality:BALBALAN
Barangay :POSWOY
Name of Sub-Project:Rehabilitation Of BALONG CIS
Sub-Project Type:COMMUNAL IRRIGATION SYSTEM
Implementation Status:COMPLETED
CFA/Non-CFA:NON CFA
Quantity:10.0
Unit:HAS.
Total Project Cost:1,632,973.76
Fund Source:OFID
% Physical Accomplishment:100%
REMARKS:PHYSICALLY COMPLETED
Foot Path Proponent :MLGU
Province :KALINGA
Municipality:BALBALAN
Barangay :TAWANG
Name of Sub-Project:Concreting of MADODNA-AW-BONONG FP
Sub-Project Type:FOOTPATH
Implementation Status: COMPLETED
CFA/Non-CFA:NON CFA
Quantity:1,260.00
Unit:LMS.
Total Project Cost:1,781,099.76
Fund Source:OFID
% Physical Accomplishment: 100%
REMARKS: PHYSICALLY COMPLETED
Foot Path Proponent :MLGU
Province :KALINGA
Municipality:LUBUAGAN
Barangay :UPPER-UMA
Name of Sub-Project:Rehab. Of KELA-BACAO-DUYAAS MAGMAG-AN FP
Sub-Project Type:FOOTPATH
Implementation Status: COMPLETED
CFA/Non-CFA:NON CFA
Quantity:1657
Unit:LMS.
Total Project Cost:2,900,000.00
Fund Source:OFID
% Physical Accomplishment: 100%
REMARKS: PHYSICALLY COMPLETED
Kela Bacao Duya-as Magmag-an FP - 014.jpgDate: Jan 1, 2000, 1:35 PM
Number of Comments on Photo:0

View Photo

FMR Proponent :PLGU
Province :KALINGA
Municipality:PASIL
Barangay :AMDALAO, GUINA-ANG, GALDANG
Name of Sub-Project:Improvement of AMDALAO-GUINA-ANG-GALDANG FMR
Sub-Project Type:FARM TO MARKET ROAD
Implementation Status: COMPLETED
CFA/Non-CFA:CFA (75M)
Quantity:2.0
Unit:KMS.
Total Project Cost:5,500,000.00
Fund Source:OFID
% Physical Accomplishment: 100%
REMARKS: PHYSICALLY COMPLETED,100% PROJECT COUNTERPART RELEASED
FMR Proponent :PLGU
Province :KALINGA
Municipality:TANUDAN
Barangay :TALOCTOC, ANGGACAN
Name of Sub-Project:Rehabilitation of TALOCTOC-ANGGACAN FMR
Sub-Project Type:FARM TO MARKET ROAD
Implementation Status: ON-GOING
CFA/Non-CFA:NON CFA
Quantity:1.40
Unit:KMS.
Total Project Cost:3,766,666.00
Fund Source:IFAD
% Physical Accomplishment: 80%
REMARKS: ON-GOING IMPLEMENTATION
FMR Proponent :PLGU
Province :KALINGA
Municipality:TINGLAYAN
Barangay :BELONG
Name of Sub-Project:Rehabilitation of BELONG-MANUBAL FMR
Sub-Project Type:FARM TO MARKET ROAD
Implementation Status: COMPLETED
CFA/Non-CFA:NON CFA
Quantity:1.7
Unit:KMS.
Total Project Cost:4,400,000.00
Fund Source:IFAD
% Physical Accomplishment: 100%
REMARKS: PHYSICALLY COMPLETED, 100% PROJECT COUNTERPART RELEASED
FMR Proponent :MLGU
Province :KALINGA
Municipality:LUBUAGAN
Barangay :TANGLAG
Name of Sub-Project:Rehabilitation of TANGLAG FMR
Sub-Project Type:FARM TO MARKET ROAD
Implementation Status: COMPLETED
CFA/Non-CFA:NON CFA
Quantity:3.0
Unit:KMS.
Total Project Cost:4,000,000.00
Fund Source:OFID
% Physical Accomplishment: 100%
REMARKS: PHYSICALLY COMPLETED
Foot Bridge Proponent :MLGU
Province :KALINGA
Municipality:BALBALAN
Barangay :AB-ABA-AN
Name of Sub-Project:Constn. Of IPIL SLAB FB
Sub-Project Type:FOOTBRIDGE
Implementation Status:COMPLETED
CFA/Non-CFA:NON CFA
Quantity:10.5
Unit:LMS
Total Project Cost:151,158.51
Fund Source:OFID
% Physical Accomplishment:100%
REMARKS: PHYSICALLY COMPLETED
Proponent :MLGU
Province :KALINGA
Municipality:BALBALAN
Barangay :AB-ABA-AN
Name of Sub-Project:Rehabilitation Of BOTOL CIS
Sub-Project Type:COMMUNAL IRRIGATION SYSTEM
Implementation Status:COMPLETED
CFA/Non-CFA:NON-CFA
Quantity:25.0
Unit:HAS.
Total Project Cost:1,605,052.59
Fund Source:OFID
% Physical Accomplishment:100%
REMARKS:PHYSICALLY COMPLETED
Foot Path Proponent :MLGU
Province :KALINGA
Municipality:BALBALAN
Barangay :AB-ABA-AN
Name of Sub-Project:Concreting of LUBWAK-BOTOL FP
Sub-Project Type:FOOTPATH
Implementation Status: COMPLETED
CFA/Non-CFA:NON CFA
Quantity:1000
Unit:LMS.
Total Project Cost:1,023,468.40
Fund Source:OFID
% Physical Accomplishment: 100%
REMARKS: PHYSICALLY COMPLETED
Tree (1)Type of Project : Reforestation
Location : Tulgao East, Tinglayan, KALINGA
Name of People's Org'n : Ichasan Organization
Name of PO/IPO Pres. : Johnny P. Salabao
Project Cost : 2,895,695.98
Total Area : 125(71 refo/54 Expansion)Has.
Date Started : May 2011/August 2014(Expansion)
Date Completion(Revised): December 2014/December 2015(Expansion)
No. of refo sites : 1
Area Planted/% Planted : 125 Has./100%
Total Amount Released : 2,228,309.98
Balance Amount : 667,386.00
REMARKS : Activities completed/2 passes maintenance to be conducted(Expansion)

(2)Type of Project : Agroforestry
Name of People's Org'n : Ichasan Organization
Location : Tulgao East, Tinglayan, KALINGA
Name of PO/IPO Pres. : Johnny P. Salabao
Total Area : 13.00 Has.
Total Cost : 416,000.00
Date Started : March 2014
Date Completion(Revised): October 2015
Agro Plots : 30
Area Planted(Ha.) : 13.00 Has.
Area Planted(%) : 100%
Species Planted : -
Total Amt. Released : 374,400.00
Balance Amount : 41,600.00
REMARKS : Maintenance on-going
LEGEND
FMR Farm-to-Market Road(FMR)
Foot Bridge Foot Bridge(FB)
Domestic Water Supply Domestic Water Supply(DWS)
Communal Irrigation System Communal Irrigation System(CIS)
Foot Path Foot Path/Trail(FP/FT)
Home Community Infrastructure-MP Warehouse/MPDP
Refo/ANR Reforestation/ANR & Agroforestry
Physically Completed Sub-Projects Physically Completed Sub-Projects
Cancelled Sub-Projects Cancelled Sub-Projects

 

Kalinga Map

 

 

 

 

 

 

 

Tree (1)Type of Project : Reforestation
Location : Gaang, Tanudan, KALINGA
Name of People's Org'n : Gaang Tribal Unity for Development
Name of PO/IPO Pres. : Romeo S. Banao
Project Cost : 1,740,000.00
Total Area : 75(50 refo/25 Expansion)Has.
Date Started : May 14,2012/June 2014(Expansion)
Date Completion(Revised): June 2015/March 2016
No. of refo sites : 2
Area Planted/% Planted : 75 Has./100%
Total Amount Released : 1,321,947.00
Balance Amount : 418,053.00
REMARKS : Activity completed/2 passes maitenance to be conducted(Expansion)

(2)Type of Project : Agroforestry
Name of People's Org'n : Gaang Tribal Unity for Development
Location : Gaang, Tanudan, KALINGA
Name of PO/IPO Pres. : Romeo S. Banao
Total Area : 13.85 Has.
Total Cost : 443,200.00
Date Started : July 2014
Date Completion(Revised): January 2015
Agro Plots : 39
Area Planted(Ha.) : 13.85 Has.
Area Planted(%) : 100%
Species Planted : Rambutan, lanzones & citrus
Total Amt. Released : 398,880.00
Balance Amount : 44,320.00
REMARKS : Maintenance on-going
Tree (1)Type of Project : Reforestation
Location : Tanglag, Lubuagan, KALINGA
Name of People's Org'n : Tanglag Community Organization for Unity & Development
Name of PO/IPO Pres. : Esther Basia
Project Cost : 719,200.00
Total Area : 31(Expansion Area) Has.
Date Started : February 2014
Date Completion(Revised): December 2015
No. of refo sites : 1
Area Planted/% Planted : 31 Has./100%
Total Amount Released : 288,135.00
Balance Amount : 431,065.00
REMARKS : 2 passes maintenance to be conducted

(2)Type of Project : Agroforestry(2 Batches)
Name of People's Org'n : Tanglag Community Organization for Unity & Development
Location : Tanglag, Lubuagan, KALINGA
Name of PO/IPO Pres. : -
Total Area : 18.42 Has.
Total Cost : 589,440.00
Date Started : November 2014
Date Completion(Revised): January 2016
Agro Plots : 32
Area Planted(Ha.) : 18.42 Has.
Area Planted(%) : 100%
Species Planted : -
Total Amt. Released : 403,020.00
Balance Amount : 186,420.00
REMARKS : Maintenance on-going
Tree (1)Type of Project : Reforestation
Location : Anggacan Sur, Tanudan, KALINGA
Name of People's Org'n : Laga-on Association
Name of PO/IPO Pres. : John G. Manaing
Project Cost : 696,000.00
Total Area : 30 Has.
Date Started : May 2012
Date Completion(Revised): December 2015
No. of refo sites : 2
Area Planted/% Planted : 30 Has./100%
Total Amount Released : 537,907.50
Balance Amount : 158,092.50
REMARKS : Last pass maintenance on-going

(2)Type of Project : Agroforestry
Name of People's Org'n : Laga-on Association
Location : Anggacan Sur, Tanudan, KALINGA
Name of PO/IPO Pres. : -
Total Area : 12 Has.
Total Cost : 384,000.00
Date Started : December 2014
Date Completion(Revised): October 2015
Agro Plots : 30
Area Planted(Ha.) : 12 Has.
Area Planted(%) : 100%
Species Planted : Rambutan
Total Amt. Released : 341,600.00
Balance Amount : 42,400.00
REMARKS : Maintenance on-going
Tree (1)Type of Project : Reforestation
Location : Ababa-an, Balbalan, KALINGA
Name of People's Org'n : Ababa-an Farmers Association
Name of PO/IPO Pres. : Leonardo Doy-ac
Project Cost : 1,160,000.00
Total Area : 50 Has.
Date Started : March 14, 2012
Date Completion(Revised): December 2015
No. of refo sites : 3
Area Planted/% Planted : 50 Has./100%
Total Amount Released : 896,512.49
Balance Amount : 263,487.51
REMARKS : Last pass maintenance on-going

(2)Type of Project : Agroforestry
Name of People's Org'n : Ababa-an Farmers Association
Location : Ababa-an, Balbalan, KALINGA
Name of PO/IPO Pres. : Arnold S. Camma
Total Area : 10.00 Has.
Total Cost : 320,000.00
Date Started : July 2013
Date Completion(Revised): September 2015
Agro Plots : 32
Area Planted(Ha.) : 10.00 Has.
Area Planted(%) : 100%
Species Planted : Ponkan & Rambutan
Total Amt. Released : 287,999.50
Balance Amount : 32,000.50
REMARKS : Maintenance on-going
Tree (1)Type of Project : Reforestation
Location : Colayo, Pasil, KALINGA
Name of People's Org'n : Colayo Indigenous Peoples Organization
Name of PO/IPO Pres. : Andres Guisoben
Project Cost : 1,740,000.00
Total Area : 75(60 refo/15 Expansion)Has.
Date Started : March 2012
Date Completion(Revised): December 2015
No. of refo sites : 1
Area Planted/% Planted : 75 Has./100%
Total Amount Released : 1,202,508.01
Balance Amount : 537,491.99
REMARKS : Last pass maintenance on-going/2 passes maintenance to be conducted(Expansion)

(2)Type of Project : Agroforestry
Name of People's Org'n : Colayo Indigenous Peoples Organization
Location : Colayo, Pasil, KALINGA
Name of PO/IPO Pres. : -
Total Area : 14.00 Has.
Total Cost : 448,000.00
Date Started : March 2014
Date Completion(Revised): January 2016
Agro Plots : 35
Area Planted(Ha.) : 14.00 Has.
Area Planted(%) : 100%
Species Planted : Citrus and Rambutan
Total Amt. Released : 392,400.00
Balance Amount : 55,600.00
REMARKS : Maintenance on-going
Tree (1)Type of Project : Reforestation
Location : Basao, Tinglayan, KALINGA
Name of People's Org'n : Basao Concern People for Transformation
Name of PO/IPO Pres. : Edwin T. Agway
Project Cost : 1,508,000.00
Total Area : 65(50 refo/15 Expansion)Has.
Date Started : June 2012/May 1,2014(Expansion)
Date Completion(Revised): June 2015/March 2016(Expansion)
No. of refo sites : 1
Area Planted/% Planted : 65 Has./100%
Total Amount Released : 885,633.30
Balance Amount : 622,366.70
REMARKS : Last pass maintenance not yet conducted/2 passes maintenance to be conducted(Expansion)

(2)Type of Project : Agroforestry
Name of People's Org'n : Basao Concern People for Transformation
Location : Basao, Tinglayan, KALINGA
Name of PO/IPO Pres. : -
Total Area : 13.67 Has.
Total Cost : 416,000.00
Date Started : November 2014
Date Completion(Revised): January 2016
Agro Plots : 37
Area Planted(Ha.) : 13.67 Has.
Area Planted(%) : 100%
Species Planted : -
Total Amt. Released : 319,250.00
Balance Amount : 118,190.00
REMARKS : Maintenance on-going
FMR Proponent :PLGU
Province :KALINGA
Municipality:TANUDAN
Barangay :ANGGACAN
Name of Sub-Project:Improvement of DALNACAN-TALOCTOC-ANGGACAN FMR
Sub-Project Type:FARM TO MARKET ROAD
Implementation Status:COMPLETED
CFA/Non-CFA:CFA (50M)
Quantity:13.5
Unit:KMS.
Total Project Cost:20,000,000.00
Fund Source:OFID
% Physical Accomplishment:100%
REMARKS:PHYSICALLY COMPLETED,100% PROJECT COUNTERPART RELEASED
FMR Proponent :PLGU
Province :KALINGA
Municipality:TINGLAYAN
Barangay :BUTBUT
Name of Sub-Project:Rehabilitation of BUTBUT-SUNGANG-POBLACION FMR
Sub-Project Type:FARM TO MARKET ROAD
Implementation Status: COMPLETED
CFA/Non-CFA:CFA (75M)
Quantity:5.0
Unit:KMS.
Total Project Cost:10,000,000.00
Fund Source:OFID
% Physical Accomplishment: 100%
REMARKS: PHYSICALLY COMPLETED
Foot Path Proponent :MLGU
Province :KALINGA
Municipality:PASIL
Barangay :BALATOC
Name of Sub-Project:Concreting of TUWER-PANAD FP
Sub-Project Type:FOOTPATH
Implementation Status: COMPLETED
CFA/Non-CFA:NON CFA
Quantity:781
Unit:LMS.
Total Project Cost:1,017,500.00
Fund Source:OFID
% Physical Accomplishment: 100%
REMARKS: PHYSICALLY COMPLETED,100% PROJECT COUNTERPART RELEASED
Proponent :MLGU
Province :KALINGA
Municipality:LUBUAGAN
Barangay :UPPER UMA
Name of Sub-Project:Rehabilitation of MAGTILIN CIS
Sub-Project Type:COMMUNAL IRRIGATION SYSTEM
Implementation Status: COMPLETED
CFA/Non-CFA:NON CFA
Quantity:18.0
Unit:HAS.
Total Project Cost:1,800,000.00
Fund Source:IFAD
% Physical Accomplishment: 100%
REMARKS: PHYSICALLY COMPLETED
CIS

 

Tree (1)Type of Project : Reforestation
Location : Buaya, Balbalan, KALINGA
Name of People's Org'n : Buaya Farmers Association for Development
Name of PO/IPO Pres. : Michael Jake J. Dunas
Project Cost : 1,160,000.00
Total Area : 50 Has.
Date Started : March 15, 2012
Date Completion(Revised): December 2015
No. of refo sites : 3
Area Planted/% Planted : 50 Has./100%
Total Amount Released : 896,512.50
Balance Amount : 263,487.50
REMARKS : Last pass maintenance on-going

(2)Type of Project : Agroforestry
Name of People's Org'n : Buaya Farmers Association for Dev't.
Location : Buaya, Balbalan, KALINGA
Name of PO/IPO Pres. : -
Total Area : 15.00 Has.
Total Cost : 480,000.00
Date Started : July 2014
Date Completion(Revised): January 2016
Agro Plots : 28
Area Planted(Ha.) : 15.00 Has.
Area Planted(%) : 100%
Species Planted : Rambutan
Total Amt. Released : 432,000.00
Balance Amount : 48,000.00
REMARKS : Maintenance on-going
Tree (1)Type of Project : Reforestation
Location : Tawang, Balbalan, KALINGA
Name of People's Org'n : Tawang Farmers Association
Name of PO/IPO Pres. : Bonifacio Bayudang
Project Cost : 1,160,000.00
Total Area : 50 Has.
Date Started : March 15, 2012
Date Completion(Revised): September 2015
No. of refo sites : 2
Area Planted/% Planted : 50 Has./100%
Total Amount Released : 896,512.50
Balance Amount : 263,487.50
Physical Status : Last pass maintenance on-going

(2)Type of Project : Agroforestry
Name of People's Org'n : Tawang Farmers Association
Location : Tawang, Balbalan, KALINGA
Name of PO/IPO Pres. : -
Total Area : 15.00 Has.
Total Cost : 480,000.00
Date Started : September 2014
Date Completion(Revised): January 2016
Agro Plots : 35
Area Planted(Ha.) : 15 Has.
Area Planted(%) : 100%
Species Planted : Rambutan
Total Amt. Released : 430,300.00
Balance Amount : 49,700.00
REMARKS : Maintenance on-going
Tree (1)Type of Project : Reforestation
Location : Upper Uma, Lubuagan, KALINGA
Name of People's Org'n : Upper Uma Association
Name of PO/IPO Pres. : Angelito S. Anton
Project Cost : 2,041,600.00
Total Area : 88(50 Refo/38 Expansion)Has.
Date Started : March 17, 2012/June 9,2014(Expansion)
Date Completion(Revised): September 2015/March 2016
No. of refo sites : 4
Area Planted/% Planted : 88 Has./100%
Total Amount Released : 1,472,085.00
Balance Amount : 569,515.00
REMARKS : Last pass maintenance on-going/2 passes maintenance to be conducted(Expansion)

(2)Type of Project : Agroforestry
Name of People's Org'n : Upper Uma Agroforestry Association
Location : Upper Uma, Lubuagan, KALINGA
Name of PO/IPO Pres. : Angela Omnas
Total Area : 12.42 Has.
Total Cost : 397,440.00
Date Started : October 2013
Date Completion(Revised): October 2015
Agro Plots : 29
Area Planted(Ha.) : 12.42 Has.
Area Planted(%) : 100%
Species Planted : Rambutan and Ponkan
Total Amt. Released : 326,758.50
Balance Amount : 70,681.50
REMARKS : Maintenance on-going
Tree (1)Type of Project : Reforestation
Location : Butbut, Tinglayan, KALINGA
Name of People's Org'n : Atanchan Farmers Association
Name of PO/IPO Pres. : Antonio M. Baccoy
Project Cost : 2,320,000.00
Total Area : 100(50 Refo/50 Expansion)Has.
Date Started : March 15,2012/February 14,2014(Expansion)
Date Completion(Revised): March 2015/December 2015(Expansion)
No. of refo sites : 1
Area Planted/% Planted : 100 Has./100%
Total Amount Released : 1,639,044.38
Balance Amount : 626,956.00
Physical Status : Activities completed/2 passes maintenance to be conducted(Expansion)

(2)Type of Project : Agroforestry
Name of People's Org'n : Atanchan Farmer's Association
Location : Butbut Proper, Tinglayan, KALINGA
Name of PO/IPO Pres. : Antonio M. Baccoy
Total Area : 15.00 Has.
Total Cost : 480,000.00
Date Started : July 2013
Date Completion(Revised): July 2015
Agro Plots : 44
Area Planted(Ha.) : 15 Has.
Area Planted(%) : 100%
Species Planted :-
Total Amt. Released : 418,050.00
Balance Amount : 61,950.00
REMARKS : Maintenance on-going
Tree (1)Type of Project : Reforestation
Location : Belong Manubal, Tinglayan, KALINGA
Name of People's Org'n : Belong-Man-ubal Farmers Association
Name of PO/IPO Pres. : Bruce Baggiw
Project Cost : 2,204,000.00
Total Area : 95(50 refo/45 Expansion)Has.
Date Started : February 29, 2012/May 1,2014(Expansion)
Date Completion(Revised): March 2015/December 2015(Expansion)
No. of refo sites : 1
Area Planted/% Planted : 95 Has./100%
Total Amount Released : 1,458,337.51
Balance Amount : 745,662.49
REMARKS : Activities completed/2 passes maintenance to be conducted(Expansion)

(2)Type of Project : Agroforestry
Name of People's Org'n : Belong-Man-ubal Farmer's Association
Location : Belong Manubal, Tinglayan, KALINGA
Name of PO/IPO Pres. : -
Total Area : 15.73 Has.
Total Cost : 416,000.00.00
Date Started : December 2014
Date Completion(Revised): October 2015
Agro Plots : 36
Area Planted(Ha.) : 15.73 Has.
Area Planted(%) : 100%
Species Planted : -
Total Amt. Released : 432,589.11
Balance Amount : 70,770.89
REMARKS : Maintenance on-going
Tree (1)Type of Project : Reforestation
Location : Galdang, Pasil, KALINGA
Name of People's Org'n : Galdang Indigenous Peoples Organization
Name of PO/IPO Pres. : Peter Manangbao
Project Cost : 2,111,200.00
Total Area : 91 Has.
Date Started : March 15, 2012/May 17,2014(Expansion)
Date Completion(Revised): September 2015/June 2016(Expansion)
No. of refo sites : 1
Area Planted/% Planted : 91 Has./100%
Total Amount Released : 1,241,509.51
Balance Amount : 869,690.49
REMARKS : Last pass maintenance on-going/2 passes maintenance to be conducted(Expansion)

(2)Type of Project : Agroforestry
Name of People's Org'n : Galdang Indigenous Peoples Organization
Location : Galdang, Pasil, KALINGA
Name of PO/IPO Pres. : Ruben A. Baddongon
Total Area : 13.50 Has.
Total Cost : 432,000.00
Date Started : July 2013
Date Completion(Revised): October 2015
Agro Plots : 27
Area Planted(Ha.) : 13.50 Has.
Area Planted(%) : 100%
Species Planted : Citrus & Rambutan
Total Amt. Released : 372,600.00
Balance Amount : 59,400.00br/> REMARKS : Maintenance on-going
Tree (1)Type of Project : Reforestation
Location : Anggacan, Tanudan, KALINGA
Name of People's Org'n : Tinanang Incorporated
\ Name of PO/IPO Pres. : Antonio G. Calading
Project Cost : 1,160,000.00
Total Area : 50 Has.
Date Started : March 2012
Date Completion(Revised): December 2015
No. of refo sites : 1
Area Planted/% Planted : 50 Has./100%
Total Amount Released : 663,637.50
Balance Amount : 496,362.50
REMARKS : Last pass maintenance not yet conducted

(2)Type of Project : Agroforestry
Name of People's Org'n : Tinanang Incorporated
Location : Anggacan, Tanudan, KALINGA
Name of PO/IPO Pres. : -
Total Area : 13 Has.
Total Cost : 416,000.00
Date Started : September 2014
Date Completion(Revised): October 2015
Agro Plots : 30
Area Planted(Ha.) : 13 Has.
Area Planted(%) : 100%
Species Planted : Rambutan
Total Amt. Released : 374,400.00.00
Balance Amount : 41,600.00
REMARKS : Maintenance on-going
Tree (1)Type of Project : Reforestation
Location : Dacalan, Tanudan, KALINGA
Name of People's Org'n : Dakaran Peoples Association for Development
Name of PO/IPO Pres. : Lorenzo B. Baliwag
Project Cost : 1,972,000.00
Total Area : 85(60 refo/25 Expansion)Has.
Date Started : May 14, 2012/May 2014(Expansion)
Date Completion(Revised): June 2015/March 2016(Expansion)
No. of refo sites : 2
Area Planted/% Planted : 85 Has./100%
Total Amount Released : 1,176,777.00
Balance Amount : 795,223.00
REMARKS : Last pass maintenance not yet conducted/2 passes maintenance to be conducted(Expansion)

(2)Type of Project : Agroforestry
Name of People's Org'n : Dakaran Peoples Association for Development
Location : Dacalan, Tanudan, KALINGA
Name of PO/IPO Pres. : -
Total Area : 13.00 Has.
Total Cost : 416,000.00.00
Date Started : November 2014
Date Completion(Revised): October 2015
Agro Plots : 41
Area Planted(Ha.) : 13.00 Has.
Area Planted(%) : 100%
Species Planted : Rambutan
Total Amt. Released : 374,400.00
Balance Amount : 41,600.00
REMARKS : Maintenance on-going
Tree (1)Type of Project : Reforestation
Location : Poswoy, Balbalan, KALINGA
Name of People's Org'n : Poswoy Farmers Association for Development
Name of PO/IPO Pres. : Herman B. Gangot
Project Cost : 1,160,000.00
Total Area : 50 Has.
Date Started : May 2012
Date Completion(Revised): September 2015
No. of refo sites : 3
Area Planted/% Planted : 50 Has./100%
Total Amount Released : 896,512.50
Balance Amount : 263,487.50
REMARKS : Last pass maintenance on-going

(2)Type of Project : Agroforestry
Name of People's Org'n : Poswoy Farmers Association
Location : Poswoy, Balbalan, KALINGA
Name of PO/IPO Pres. : Herman B. Gangot
Total Area : 9.50 Has.
Total Cost : 304,000.00
Date Started : July 2013
Date Completion(Revised): September 2015
Agro Plots : 31
Area Planted(Ha.) : 9.50 Has.
Area Planted(%) : 100
Species Planted : Rambutan
Total Amt. Released : 268,650.00
Balance Amount : 35,350.00
REMARKS : Maintenance on-going
CIS Proponent :MLGU
Province :KALINGA
Municipality:LUBUAGAN
Barangay :MABILONG
Name of Sub-Project:Rehabilitation Of BELALAO CIS
Sub-Project Type:COMMUNAL IRRIGATION SYSTEM
Implementation Status:COMPLETED
CFA/Non-CFA:NON CFA
Quantity:15.0
Unit:HAS.
Total Project Cost:2,800,000.00
Fund Source:OFID
% Physical Accomplishment:100%
REMARKS:PHYSICALLY COMPLETED
CIS Proponent :MLGU
Province :KALINGA
Municipality:TANUDAN
Barangay :GAANG
Name of Sub-Project:Rehabilitation of GURON CIS
Sub-Project Type:COMMUNAL IRRIGATION SYSTEM
Implementation Status: COMPLETED
CFA/Non-CFA:NON CFA
Quantity:20.0
Unit:HAS.
Total Project Cost:1,128,000.00
Fund Source:OFID
% Physical Accomplishment: 100%
REMARKS: PHYSICALLY COMPLETED
CIS Proponent :MLGU
Province :KALINGA
Municipality:TANUDAN
Barangay :DACALAN
Name of Sub-Project:Rehabilitiation of SURKOK CIS
Sub-Project Type:COMMUNAL IRRIGATION SYSTEM
Implementation Status: COMPLETED
CFA/Non-CFA:NON CFA
Quantity:15.0
Unit:HAS.
Total Project Cost:750,000.00
Fund Source:IFAD
% Physical Accomplishment: 100%
REMARKS: PHYSICALLY COMPLETED
CIS Proponent :MLGU
Province :KALINGA
Municipality:TANUDAN
Barangay :ANGGACAN
Name of Sub-Project:Rehabilitation of TUWOL CIS
Sub-Project Type:COMMUNAL IRRIGATION SYSTEM
Implementation Status: COMPLETED
CFA/Non-CFA:NON CFA
Quantity:10.0
Unit:HAS.
Total Project Cost:417,408.20
Fund Source:OFID
% Physical Accomplishment: 100%
REMARKS: PHYSICALLY COMPLETED
CIS Proponent :MLGU
Province :KALINGA
Municipality:BALBALAN
Barangay :BUAYA
Name of Sub-Project:Construction Of BANGLAG CIS
Sub-Project Type:COMMUNAL IRRIGATION SYSTEM
Implementation Status:COMPLETED
CFA/Non-CFA:NON CFA
Quantity:10.0
Unit:HAS.
Total Project Cost:735,764.46
Fund Source:OFID % Physical Accomplishment:100%
REMARKS:PHYSICALLY COMPLETED
CIS Proponent :MLGU
Province :KALINGA
Municipality:BALBALAN
Barangay :BUAYA
Name of Sub-Project:Rehabilitation of KABILLAN-LAPUC CIS
Sub-Project Type:COMMUNAL IRRIGATION SYSTEM
Implementation Status: COMPLETED
CFA/Non-CFA:NON CFA
Quantity:20.0
Unit:HAS.
Total Project Cost:2,507,351.54
Fund Source:
% Physical Accomplishment: 100%
REMARKS: PHYSICALLY COMPLETED
Drinking Water (1)Proponent:MLGU
Province :KALINGA
Municipality:BALBALAN
Barangay :BUAYA
Name of Sub-Project:Rehabilitation of DALIMOGAO DWS
Sub-Project Type:DOMESTIC WATER SUPPLY
Implementation Status: COMPLETED
CFA/Non-CFA:NON CFA
Quantity:1.0/26
Unit:HHs
Total Project Cost:528,975.17
Fund Source:IFAD
% Physical Accomplishment: 100%
REMARKS: PHYSICALLY COMPLETED

(2)Proponent:MLGU
Province :KALINGA
Municipality:BALBALAN
Barangay :BUAYA
Name of Sub-Project:Rehabilitation of LAPUC WATER WORKS SYSTEM
Sub-Project Type:DOMESTIC WATER SUPPLY
Implementation Status: COMPLETED
CFA/Non-CFA:NON CFA
Quantity:1.0/27
Unit:HHs
Total Project Cost: 534,644.94
Fund Source:IFAD
% Physical Accomplishment: 100%
REMARKS: PHYSICALLY COMPLETED

 

 

 

 

 

 

 

 

Summary: OVERALL PHYSICAL STATUS of Infra sub-projects(KALINGA)

Total no. of Sub-Projects(SPs): 34

Physically Completed SPs: 34(100% Overall)

Status of On-going Sub-Projects: All Sub-Projects physically completed

COMPONENT UPDATES:pdf iconDetailed/Tabular Format

Tree (1)Type of Project : Reforestation
Location : Mabilong, Lubuagan, KALINGA
Name of People's Org'n : Salidummay Communities Development Association, Inc.
Name of PO/IPO Pres. : Ophelia Grace Addom
Project Cost : 1,388,362.80
Total Area : 60 Has.
Date Started : May 2011
Date Completion(Revised): December 2015
No. of refo sites : 3
Area Planted/% Planted : 60 Has./100%
Total Amount Released : 601,031.69
Balance Amount : 787,331.11
REMARKS : Last pass maintenance on-going

(2)Type of Project : Agroforestry
Name of People's Org'n : Imabilong Farmers Fields School Organization
Location : Mabilong, Lubuagan, KALINGA
Name of PO/IPO Pres. : Honesty L. Bumusao
Total Area : 12.00 Has.
Total Cost : 384,000.00
Date Started : December 2013
Date Completion(Revised): October 2015
Agro Plots : 32
Area Planted(Ha.) : 12.00 Has.
Area Planted(%) : 100%
Species Planted : Rambutan and Ponkan
Total Amt. Released : 318,262.50
Balance Amount : 65,737.50
REMARKS : Maintenance on-going
Tree (1)Type of Project : Reforestation
Location : Bagtayan, Pasil, KALINGA
Name of People's Org'n : Bagtayan Indigenous Peoples Organization
Name of PO/IPO Pres. : Jaime Atolba
Project Cost : 2,130,641.56
Total Area : 92(62 Refo/30 Expansion)Has.
Date Started : May 2011/September 2014(Expansion)
Date Completion(Revised): December 2015/June 2016(Expansion)
No. of refo sites : 1
Area Planted/% Planted : 92 Has./100%
Total Amount Released : 780,628.60
Balance Amount : 1,350,012.96
REMARKS : Last pass maintenance on-going/2 passes maintenance to be conducted(Expansion)

(2)Type of Project : Agroforestry
Name of People's Org'n : Bagtayan Indigenous Peoples Organization
Location : Bagtayan, Pasil, KALINGA
Name of PO/IPO Pres. : Jaime Atolba
Total Area : 10.00 Has.
Total Cost : 320,000.00
Date Started : July 21,2013
Date Completion(Revised): October 2015
Agro Plots : 26
Area Planted(Ha.) : 10.00 Has.
Area Planted(%) : 100%
Species Planted : Arabica Coffee
Total Amt. Released : 269,100.00
Balance Amount : 50,900.00
REMARKS : Maintenance on-going

(3)Type of Project : Agroforestry(2nd Batch)
Name of People's Org'n : Bagtayan Indigenous Peoples Organization
Location : Bagtayan, Pasil, KALINGA
Name of PO/IPO Pres. : -
Total Area : 12.38 Has.
Total Cost : 396,160.00
Date Started : October 2014
Date Completion(Revised): January 2016
Agro Plots : 33
Area Planted(Ha.) : 12.38 Has.
Area Planted(%) : 100%
Species Planted : -
Total Amt. Released : 353,920.00
Balance Amount : 42,240.00
REMARKS : Maintenance on-going
Drinking Water Proponent :MLGU
Province :KALINGA
Municipality:PASIL
Barangay :COLAYO
Name of Sub-Project:Construction Of SULBUKAN DWS
Sub-Project Type:DOMESTIC WATER SUPPLY
Implementation Status:COMPLETED
CFA/Non-CFA:NON CFA
Quantity:1.0/53
Unit:UNIT/HHs
Total Project Cost:815,993.02
Fund Source:OFID
% Physical Accomplishment:100%
REMARKS:PHYSICALLY COMPLETED,100% PROJECT COUNTERPART RELEASED
Foot Path Proponent :MLGU
Province :KALINGA
Municipality:PASIL
Barangay :BAGTAYAN
Name of Sub-Project:Concreting of BAWI-PUA FP
Sub-Project Type:FOOTPATH
Implementation Status:COMPLETED
CFA/Non-CFA:NON CFA
Quantity:600.00
Unit:LMS.
Total Project Cost:494,714.28
Fund Source:OFID
% Physical Accomplishment:100%
REMARKS:PHYSICALLY COMPLETED,100% PROJECT COUNTERPART RELEASED
FMR Proponent :PLGU
Province :KALINGA
Municipality:TINGLAYAN
Barangay :TULGAO EAST
Name of Sub-Project:Rehabilitation of TULGAO EAST FMR
Sub-Project Type:FARM TO MARKET ROAD
Implementation Status: COMPLETED
CFA/Non-CFA:NON CFA
Quantity:2.5
Unit:KMS.
Total Project Cost:4,250,000.00
Fund Source:OFID
% Physical Accomplishment: 100%
REMARKS: PHYSICALLY COMPLETED, 100% PROJECT COUNTERPART RELEASED

  • Equipment
  • ESF Training
  • FBS
  • Financial Literacy
  • LAF
  • Learning Visits
  • O and M Training
  • Production Training
  • Skills Training
  • Starter Kits(Meat/Food)
  • Supplies/Materials
  • Techno Demo